Modify Selection
- Hazard prevention and control:
- Education and training
- or
- Job skills training
- or
- Hazard training
- or
- Individual training
- or
- New task training
- or
- Annual refresher training
Home Links
Results 41 - 50 of 103
-
7/18/2016 - Contracts and cooperative agreementsA capacity-building contract to examine the explosion and fire hazards in the gobs of underground longwall coal mines through physical and numerical modeling.
-
7/16/2016 - Contracts and cooperative agreementsA capacity-building contract to enhance ground control safety and produce qualified MS and PhD graduates with ground control expertise through improving and extending the LaModel program.
-
4/29/2016 - Contracts and cooperative agreementsA capacity-building contract to research using booster fans in deep coal mines in the western U.S., where coal seams can have over 3,000 ft of overburden causing ventilation and ground control problems.
-
4/29/2016 - Contracts and cooperative agreementsA capacity-building contract to investigate safety aspects of mine ventilation through technical development and training.
-
12/1/2015 - Non-peer reviewed journal articlesThis trade publication piece by NIOSH discusses the new BG 4 benching trainer software developed for mine rescue team members to practice assembly and testing of a Draeger BG 4 rescue breathing apparatus.
-
9/22/2015 - Research areasRescue Technologies and Training Topic Page
-
8/1/2015 - Technology NewsThe BG 4 Benching Trainer software helps to reinforce the critical skills that mine rescue team members must possess to accurately bench closed-circuit breathing apparatus and keep mine rescue team members safe during mine emergencies.
-
12/29/2014 - News articlesThe BG 4 Benching Trainer Software is an interactive software program developed by NIOSH and targeted as reinforcement training of benching competencies for mine rescue personnel.
-
9/1/2014 - Peer reviewed journal articlesAn article about an analysis of interviews with nine mine safety trainers using a social ecological model to examine factors that could be addressed both during and after mine safety training.
-
8/4/2014 - Contracts and cooperative agreementsA capacity-building contract to improve ventilation tasks in deep and hot underground mines to decrease injury risks; improve working conditions; meet occupational, environmental, and health standards; and reduce costs to stay competitive.
Home Links
Content source: National Institute for Occupational Safety and Health, Mining Program